Our Projects

 

We provide a complete service for all the civil and associated works for smaller subdivisions. See a selection of our projects below.

 

 
Screen Shot 2019-06-24 at 2.25.54 PM.png

Redoubt Road

4 Lot Subdivision

  • Installation of public sewer and stormwater

  • Remove and replace 120m² of reinforced driveway

  • Installation of 125OD water main

Screen Shot 2019-06-24 at 2.16.59 PM.png

Harlston Road

2 lot subdivision

  • Installation of sewer connection and 3x stormwater soakage chambers

  • Approximately 80m³ of earthworks

Screen Shot 2019-06-24 at 2.25.06 PM.png

Stanmore Bay

3 Lot Subdivision

  • Installation of sewer and stormwater

  • Construct 3x retaining walls 0.5m - 2.0m retained height

  • Construct 200m² of reinforced concrete driveway

Screen Shot 2019-06-24 at 2.10.58 PM.png

Maioro Street

2 lot subdivision

  • Installation of sewer and stormwater and 3 x 1200 diameter detention tanks

  • Construction of 100m² reinforced concrete driveway

Screen Shot 2019-06-24 at 2.15.15 PM.png

Oraha Road

  • Footpath works

  • Construct 80m long 1.0m high retaining wall; 40m of 1.5m wide boardwalk and 350lm of boxed gravel footpath in the stream reserve

Screen Shot 2019-06-24 at 2.29.12 PM.png

Parnell

Driveway removal and replacement

  • Removal and replacement of a 160m² existing exposed aggregate concrete driveway with approximate 20% grade

  • Installation of channel drain

Screen Shot 2019-06-24 at 2.13.09 PM.png

Browns Road

  • Installation of sewer and stormwater in the road reserve

 
Screen Shot 2019-06-24 at 2.32.18 PM.png

Wainui

1 Lot Subdivision 

  • Installation of twin 1350mm diameter culverts in a live stream

  • Construction of five retaining walls, retained height between 0.5m and 2.0m

  • Construction of 500m gravel driveway including all earthworks